S.A Persienn & Markisservice AB

Montera balkongmarkis B260

How to install the StyRa balcony awning B260. It stands on two leg profiles screwed to the floor and ceiling of the balcony. Read through all the steps before you start.

See the installation in 3D (beta)Manufacturer's instructions (PDF)

balcony awning B260
Tools
  • Cordless screwdriver
  • Screws and wall plugs
  • Spirit level
  • Plumb line
The whole rail

Before you start

  • The awning should sit in a secure surface. Watch out for rotten wood, crumbling render or brick, and thin panelling.
  • Check that windows and doors can be opened once the awning is up.
  • Does the awning have motor: the motor and any control equipment must be installed by a qualified electrician.

What you need

  • Cordless screwdriver, and screws and wall plugs that suit the floor and ceiling.
  • Spirit level or plumb line.
  • Something to cut the leg profiles with, if they need shortening.

The parts

Two leg profiles with tensioning kit and bushing, T-slot screws, the roller tube, the arms with front profile, lifting strap, strap lock and strap knob.

1Prepare the leg profiles

  1. Fit the tensioning kit in the leg profiles.
  2. Check that the leg profiles are the length you want. Cut them if needed.
  3. Insert the bushing in the pre-drilled hole.
  4. Insert two T-slot screws in each leg profile. They are used for the arms.
  5. Stand the leg profiles where the awning will go.

2Fit the fabric tube

  1. Insert the fabric tube.
  2. Measure and plumb the profiles so that they stand vertically.
  3. Screw the leg profiles to the ceiling and floor.

3Fit the arms

  1. The spring tension. Attach the arm's wire to one of the holes on the back of the arm mount. The top hole gives the most spring tension.
  2. Screw the arms in place in the leg profiles.
  3. Attach the arm to the front profile. Hold the arm firmly, as it is spring-loaded. Raise the arm to the front profile, hook it on and screw it in place.
  4. Fit the front onto the arms.

If the arm is in the right position, the front is level with the roller tube when the arm is folded up.

Warning: hold the arm until it is fixed in the front profile, otherwise it can spring up and injure someone.

4Pull the lift tape

  1. Pull the strap through the upper hole of the strap lock.
  2. Screw the strap lock to the wall directly below the hole in the awning, at a suitable height.
  3. Thread on the strap knob and lock it with a knot in the strap.

5Adjust

  • Run the awning up and down a few times and adjust the arms so the fabric rolls up evenly.
  • Cut the lifting strap when the awning is fully extended.

Care and safety

Clean the frame and the fabric at least once a year with a soft cloth and lukewarm water. Do not use a pressure washer, as it can damage the fabric and the electrics. More in Operation and maintenance.

Manufacturer's instructions This page is based on StyRa's installation instructions for the B260 (version 2020.01). They include pictures of every step.

Manufacturer's instructions (PDF)Questions? [email protected]

https://samarkis-filer.pages.dev/shopify/files/Montageanvisning_StyRa_B260_80c177fb-72c6-4764-b01d-0df28e344107.pdf · Questions: [email protected]